Project Update 2020-12-18

RAPID CITY, S.D. – December 18 – Work this week includes panel replacements near the Cross Street intersection, backfilling and topsoil placement along curb and sidewalks, lighting work in the median and at the intersection of Cross Street, and landscape work in the Founders Park parking lot area and near the soccer fields. Surfacing work will begin at the Canal Street intersection.

Oshkosh Street and Cross Street are open and Canal Street is closed at Omaha Street.

Access to Canal Street is from Oshkosh Street or Cross Street. Access to the Omaha Street Plaza is from 12th Street. The west entrance into Founders Park is open and the east approach to Founders Park is closed.

The southbound outside lane on Deadwood Avenue, between Cement Plant Road and Krebs Drive is closed. Sidewalk work continues on Deadwood Avenue this week along with street lighting work.

There is a 10-foot width restriction though the construction work zone. Business access on Omaha Street will remain open at all times. Left-hand turns onto Omaha Street are discouraged to allow for continued flow of traffic. Motorists are asked to be aware of suddenly slowing and merging traffic, changing work zone locations, reduced speeds through the work zone, and construction workers and equipment adjacent to the driving lane.

For questions, the public may call (605) 343-3311 and leave a message or email@ferberengineering.com. Interested persons can also follow the project on Facebook, “Omaha Street Reconstruction,” and on Twitter, “Omaha Street Reconstruction@FerbEngCo.” Additional information will be provided as phasing, access, and traffic control changes with the progression of the project. To view the entire scope of the project, with the phasing and traffic control plans as well as weekly updates, please visit the project story map at https://arcg.is/1yqz450.

Sidewalk and Colored Concrete near Omaha Street Plaza 2020-12-16
Sidewalk and Colored Concrete near Omaha Street Plaza 2020-12-16